Current Events

12-23-2008   CCW Arundo/Tamarisk Removal Program(CCARP) comments on this Notice of Preparation should be received by February 2, 2009 no later than 5:00 pm to Noreen Cabanting at Wildscape Restoration. RCDVC CEQA NOP Arundo Removal 1219081.pdf

12-22-2008   Comment Letter - proposed Recycled Water Policy  CCWComments to SWRCB on Recycled Water Policy 121908

12-16-2008 State Water Resources Control Board Draft Recycled Water Policy – The State Board is soliciting comments on its draft recycled water policy by December 22, 2008 at noon.  Additional information may be accessed through the State Board’s website, www.waterboards.ca.gov, by following the links to programs – water recycling – recycled water policy. As a reference for parties interesting in commenting, we are providing the comment letters developed by WateReuse Foundation, the Association of California Water Agencies, and California Association of Sanitary Agencies as well as the State’s draft policy. SWRCB draft_recycled_water_policy_110408 ;       WRF-ACWA-CASA Model Letter Recycled Water Policy   ;      WRF-ACWA-CASA Attachment 1ModelLetter ; WRF-ACWA-CASA 12-11-08RevisedCommentsRWPOlicy ; WRF-ACWA-CASA Att1DraftCommentsRWPolicyRevised12-11-08 _2_…

11-5-2008 Comments to the State Water Resources Control Board on behalf of the watershed Bacteria TMDL working group, CCW State Bacteria Standards Comment Letter 1104081.pdf

9-2-2008 Comments solicited on Calleguas Creek Watershed Arundo/Tamarisk Removal Program Long Term Implementation Plan, CCARP LTIP Exec Sum and TOC 20080822.pdf and  two tables of removal methods for Arundo and Tamarisk to be included in the LTIP CCARP LTIP Removal Methods tables 20080822.pdf.  Please forward any comments on the study to Christina Sulzman christina@wildscaperestoration.com at Wildscape Restoration by October 15, 2008.

8-21-2008 Comments on Proposed Amendment to the Water Quality Control Plan for Los Angeles Region through revision of the Waste Load Allocations for the Calleguas Creek Watershed Nitrogen Compounds and Related Effects Total Maximum Daily Load dated July 7, 2008.  Calleguas Creek WMP to LARWQCB Comments 8-21-2008.pdf

8-2008 Copper Management Memorandum for Brake Pad Partnership, July 2008 as approved by the Calleguas Creek Management Plan Steering Committee for submission to the Brake Pad Partnership.

8-4-08 The following are Requests for Qualifications: Calleguas Creek Watershed Total Maximum Daily Load Monitoring Program Assistance.  The public agencies and private interests responsible for implementing Federal Clean Water Act water quality improvement programs on the Calleguas Creek watershed (Ventura County, California) have designated Calleguas Municipal Water District as their representative to solicit RFQ's to implement water quality sampling and analyses required under adopted TMDL regulations.  Interested parties may review all RFQ's at the Calleguas Creek Management Plan website.  Upon selection, successful bidders will work as subconsultants to Larry Walker Associates, the consultant coordinating the responsible parties' TMDL implementation. Cover Letter CMWD to Interested Parties re RFQs 08042008.pdf, CCWTMP - Lab Analysis RFQ - Analytical 8-4-08.pdf, CCWTMP - Sample Collection RFQ - 8-4-08.pdf, CCWTMP - Lab Analysis RFQ - Toxicity - 8-4-08.pdf

8-1-08 The following references are provided for parties responding to RFQs for Calleguas Creek Watershed Total Maximum Daily Load Monitoring Program Assistance:  Calleguas Creek Watershed TMDL Monitoring QAPP and Calleguas Creek Watershed Monitoring Program Appendices.

7-2008 CCW Copper Management Memo for Brake Pad Partnership0708.pdf

7-22-08 SWRCB Recycled Water Policy Under Development   The State Water Resources Control Board is developing a statewide recycled water policy in collaboration with a stakeholder panel representing water resource, water quality, wastewater treatment, and environmental interests.  The issue matrix linked below was distributed at a progress briefing conducted on July 8, 2008 by WateReuse Association, the Association of California Water Agencies and the California Association of Sanitation Agencies.  The matrix shows the current progress on a variety of issues related to recycled water use.  A draft recycled water policy is expected to be available by mid-August.  If you have any comments that you wished conveyed to the stakeholder panel, please contact Dee Zinke at dzinke@calleguas.com.  

7-21-08 Calleguas Creek Watershed Arundo/Tamarisk Removal Program Draft 7-15-2008 Please forward any comments on the study to Christina Sulzman  christina@wildscaperestoration.com or Noreen Cabanting noreen@wildscaperestoration.com at Wildscape Restoration by July 30, 2008.

7-17-08 The final Algae Special Study was submitted to the Regional Board on July 16, 2008.  Due to the size of the file, the final study is available in sections as indicated below.

Algae Special Study, Part 1 of 7, Contents and Introduction

Algae Special Study, Part 2 of 7, Approach

Algae Special Study, Part 3 of 7, Abundance Assessment

Algae Special Study, Part 4 of 7, Cover Assessment

Algae Special Study, Part 5 of 7, Dissolved Oxygen & pH -1

Algae Special Study, Part 6 of 7, Dissolved Oxygen & pH -2

Algae Special Study, Part 7 of 7, Results, References, Appendix

7-11-08 Ventura County Watershed Protection Plan Integrated Watershed Protection Plan 2-11-08Comments and Response on VCWPD IWPP2-11-08 Workshop Study.pdf

7-10-08 Reference Materials for July 15, 2008 VCWPD IWPP Management Strategy Study - Short Version of Februrary 12, 2008 Workshop and Meeting Notes

7-10-08 Reference Materials for July 15, 2008 VCWPD IWPP Management Strategy Study - Draft Report Reviewed at February 12, 2008 Workshop

7-7-08 CCW Draft Algae Special Study

5-30-08 Copper Management Memoranda for Brake Pad Partnership

5-30-08 Revised Special Studies Work Plan for Minor Point Sources and Rising Groundwater - DRAFT

3-26-08 Transmittal - CCW Metals and SE TMDL Workplan SS 2 and 3

3-26-08 CCW Metals and Selenium TMDL Special Studies 2

3-26-08 CCW Metals and Selenium TMDL Special Studies 3

3-24-08 CC Toxicity TMDL Study 1 Transmittal to RWQCB - signed

3-24-08 CCW Tox TMDL SS1 Alt Urban Pest

3-7-08    Draft TMDL Submissions (Special Studies Nos. 1-3) now available for comment.  The draft studies may be found by following the Meetings tab to the Calendar, March 17.  Comments due March 19, 2008 to Tracy Krueger, TracyK@LWA.com.

2-5-08    LARWQCB - Response to Request for Extension of TMDL Deadlines

10-15-07  LARWQCB Approval Monitoring Reporting Program Letter

8-15-07    Revised CCW TMDL Quality Assurance Project Plan

6-19-07    CCW TMDL QAPP - Response to Comments Matrix

6-19-07    LARWQCB Comments on Sept. 06 Draft CCW TMDL QAPP

6-19-07    CCW TMDL Monitoring Program Appendices

6-19-07    Draft (Revision 1) CCW TMDL Monitoring QAPP

6-18-07    CCW Metals and Selenium TMDL Draft Monitoring Approach

3-22-07    OC TMDL Urban Source ID Work Plan

3-22-07    OC TMDL Agricultural Source ID Work Plan

3-22-07    OC TMDL Special Study #2 Work Plan: HCA's and Management Practices

3-22-07    OC TMDL Special Study #1 Work Plan: Sediment Transport and Effects

12-28-06  Draft CCW Salts TMDL

11-09-06  The Final IRWMP submitted by the Watersheds Coalition of Ventura County is now available on the WCVC website at http://www.watershedscoalition.org/new_items/new_items.html

10-16-06  WCVC IRWMP Review

10-16-06  Memo to Draft IRWMP

10-2-06  CCW TMDL Monitoring Program Appendix

10-2-06   Draft CCW TMDL Monitoring QAPP

8-23-06  Draft CCW TMDL Monitoring QAPP

6-14-06  Draft Calleguas Creek Quantitative Microbial Source Tracking Study Report

4-18-06 The RWQCB has received the first of two Peer Reviews on the Metals and Selenium TMDL and are currently coordinating responses with LWA.

2-28-06
Draft Calleguas Creek Metals TMDL submitted to the RWQCB and EPA.

1-26-06  Metals_TMDL_StakeholderDraft_012606.pdf

12-22-05  Public Notice for the CEQA Scoping Meeting for the Metals TMDL

12-15-05  The final Dry Season Urban Runoff Characterization Report (DSURC)

9-29-05 VCWPD Preliminary Draft IWPP (5/16/05) is being made available for stakeholder review and comment.  The July 19,2005 Presentation to the Board of Supervisors is also available for review. Please send any comments on the IWPP to Sergio Vargas of the VCWPD at sergio.vargas@ventura.org.  Additional discussion on the IWPP will occur at the October 17th Flood Protection/Sediment Management.

9-19-05 Notice of Public Hearing [68 KB pdf]

8-9-05 Aug 2005 - Final Dry Season Urban Runoff Characterization Report [7.1mb pdf]

7-15-05 The VCWPD has provided the CCWMP with digital versions of several important documents for stakeholder review and consideration. The data and models described within these documents are intended to be utilized and enhanced in the analysis of future watershed improvement projects. As such, the VCWPD as Co-Chair of the Flood Protection and Sediment Management Subcommittee are requesting stakeholder review of these documents and the submittal of any questions or comments prior to the September Subcommittee meeting.
Feb 2003 - USACE Hydrology Model [8.2mb pdf]
Mar 2003 - VCWPD Present Conditions Hydrology Model [2mb pdf]
Feb 2004 - Sediment Study for Channel Improvements [10.4mb pdf]
Apr 2005 - VCWPD Future Conditions with Projects Hydrology Model [2mb pdf]
July 2005 - VCWPD IWPP Presentation to the VC Board of Supervisors
Please direct comments to Sergio Vargas (Sergio.vargas@ventura.org) of the VCWPD for distribution to the appropriate individuals or entities.

7-8-05 Los Angeles RWQCB Adopts TMDLs for Organochlorine (OC) Pesticides, Polychlorinated Biphenyls (PCB) and Siltation AND Toxicity, Chlorpyrifos and Diazinon in Calleguas Creek, its Tributaries and Mugu Lagoon.

7-6-05 Peer review comments on Mugu Lagoon Siltation TMDL by Dr. Armstrong.

7-01-05 Technical Review by UCLA Institute of the Environment - Calleguas Creek Watershed Toxicity TMDL has been posted. Supporting Documents:
Stastical Methods Paper, Heesu Park et al.

Chapters from Thesis, Dr. Joel Pederson:
Chapter 3
Chapter 4
Chapter 5

6-15-05 Policy Review by UCLA Institute of Environment - Calleguas Creek Watershed Toxicity TMDL.

6-07-05 Letter for Refinement of WMP Meeting Structure and Responsibilities has been posted.

6-05 Calleguas Creek Watershed IRWMP Volume 2 - http://www.calleguas.com/vol2.pdf

4-28-05 The Regional Board has posted the TMDLs for Toxicity and Organochlorine Pesticides and PCBs in the Calleguas Creek watershed on their website for 45-day review:
www.swrcb.ca.gov/rwqcb4/html/meetings/tmdl/tmdl_ws_calleguas_creek.html

11-10-04 Calleguas Creek Watershed IRWMP Volume 1 - http://www.calleguas.com/vol1.pdf

The site contains the Hearing Notice and the tentative Basin Plan Amendments (BPAs). The Regional Board and Calleguas Creek Watershed Management Plan (CWMP) worked on the BPAs together, but they are ultimately Regional Board documents. The site contains two technical reports submitted by the CWMP and two by the Regional Board.

Below is a notice of a public workshop on various TMDLs to be held by the Regional Board on May 5th.

TMDL Public Notice

Mission Statement

The Calleguas Creek Watershed Management Plan (WMP or Plan), with broad stakeholder participation and support, addresses a long range comprehensive water resources; land use; economic development; open space preservation, enhancement and management; and public facility provision strategy which is cost-effective and provides benefits for all participants. A key element of the Plan is a series of action recommendations developed by participants to address Watershed-wide issues and needs in the categories described above. Another primary goal of the Plan has been to examine existing data, and to acquire and develop the new data necessary to produce an accurate characterization of the Watershed and enable participants to develop action recommendations based on dependable technology and good science.